STRUCTURE:
RCC framed structure to with stand seismic loads, Red bricks/AAC blocks
masonry in cement mortar.
WALL:
External walls of 9” thick and internal walls of 4” thick 1:6 cement motor.
PLASTERING & PAINTING:
Plastering with one coat of cement plastering and two coats of Altech finish with
luppam finish for Ceiling and walls.
Ceiling plastering in 1:4 Cement mortar and other external and internal plastering’s are of 1:5 cement mortar mix.
JOINERY WORKS:
Main Door : Specially designed polished teak wood frame with shutter.
Internal Door : Vempa wood frame with laminated flush shutters.
Windows : UPVC windows with Grills.
FLOORING:
Vitrified Tiles of RAK/JOHSON/RESTILE or equivalent in Living, Dining, Kitchen
and Bedrooms.
KITCHEN:
Polished granite platform with stainless steel sink.
BALCONY & CORRIDORS:
Best quality rustic finish Ceramic/ Vitrified tiles.
STEPS:
Best quality granite / Vitrified tiles.
PARKING:
Tiles/ Stone/ VDF
LIFTS:
Six passenger Automatic lifts of standard make with V3f Facility.
EXTERNAL WALLS:
Texture/ plaster finish with two coats of weather proof paint.
ELECTRICAL:
Finolex or Havels concealed copper wiring as per ISI standard.
PLUMBING:
CPVC/ PVC sanitary piping with ISI make of Aseervadh, Grobe, American standard or equivalent.
CEILING FINISHES:
Drawing, Dining, Living, Bedrooms and Kitchen: plain gypsum board false
ceiling Toilet/ Utility: Grid ceiling to cover service lines.
GENERATOR:Kirloskar or Mahendra Generator with 3/4 light points and 2/3 fan points.
TOILETS:
Anti-skid ceramic/ vitrified tile flooring.
TILE CLADDING/ DADOOING:
KITCHEN:
Polished glazed vitrified tiles (PGVT) of reputed make up to 2 feet height above kitchen platform.
BATHROOMS: Dado up to lintel height using glazed ceramic/ vitrified tile of
reputed make.
NOTE: Registration charges, Property tax assessment, GST charges are not included.
EXTRA : Charges for registration external electrical supply charges like transform, panel board, AP Transco
depot, municipal water supply, alterations & modifications, property tax assessment, Corpus fund, GST are extra. If any other taxes imposed by the government before handling over the project would be borne by the custome